A bathroom remodel in Scottsdale, AZ typically costs $12,000 to $28,000 for a secondary bath and $20,000 to $45,000 for a primary, and takes 3 to 6 weeks. RDC Renovation & Design Concepts is a flooring, bathroom and countertop remodeling company in Phoenix, Arizona, and this page is the whole picture for Scottsdale: real numbers, the actual timeline, the HOA rules, and the five lines worth checking on every estimate you receive, including ours.

382+
Valley Projects
5.0/5
Google Rating
1-Year
Workmanship Warranty
Local
Phoenix Showroom

What a Bathroom Remodel Costs in Scottsdale, AZ

Most contractors will not put a number on a web page. Here are the ranges RDC actually works within, so you have something to hold every Scottsdale bid against before anyone walks through your door.

ScopeTypical installed costTimeline
Tub-to-shower conversion$9,000 – $14,0005 – 8 working days
Guest or secondary bathroom, full rebuild$12,000 – $28,0003 – 4 weeks
Primary bathroom, full rebuild$20,000 – $45,0004 – 6 weeks
Primary with curbless shower and stone$35,000 – $60,0005 – 7 weeks

Please note: these are ranges, not quotes. Final pricing is set individually for each customer after an on-site measure, based on the room, the tile, the fixtures and what is found behind the wall. The only accurate number is a written estimate.

What Actually Moves the Price

  • Whether the drain moves. Scottsdale homes are almost all slab-on-grade, so relocating a shower drain means cutting concrete. This is the single largest swing in any bathroom estimate here.
  • Curb or curbless. A curbless shower needs the floor recessed so water runs the right way, which is more labor and more waterproofing detail. It is also the version most people actually want.
  • How far the tile goes. Tiling only the wet walls costs less than carrying tile to the ceiling. Ceiling-height tile is the highest-value upgrade per dollar in a small Scottsdale bathroom, because it makes the room read taller.
  • Tile format. Large-format porcelain sets faster than mosaic or herringbone. The material price is often the smaller half of that difference.
  • What is behind the wall. Nobody knows until the tile comes off. Older Scottsdale homes turn up failed pan liners, rotted blocking and galvanized supply lines. RDC quotes the known scope firmly and states in writing what would count as an extra, rather than discovering it and sending a bill.

The Five Questions to Ask Every Scottsdale Bid

If you are collecting estimates you have already noticed the spread, and the spread is almost never the tile. It is what the cheap bid leaves out. Ask all five of these, of everyone.

  1. Bonded membrane or liner system? RDC builds tile showers on a Schluter-Kerdi bonded membrane. A liner system is faster and cheaper and covers the substrate instead of sealing it. Both look finished on the last day. Only one of them still looks that way in year six.
  2. What grout, given the water here? Scottsdale water is hard. Ordinary grout in a shower shows mineral deposits within months. Epoxy or professionally sealed grout is RDC's standard, not an upgrade line.
  3. Is the estimate itemized? Demolition, plumbing, waterproofing, tile, glass and fixtures as separate lines. A single lump sum is where the surprises live.
  4. Who is in your house each day? The same crew, or whoever is free that week. On a tile job, consistency is most of the finish quality.
  5. Who holds the license for each trade? RDC is fully insured, the installation is performed by the licensed installers RDC works with, and plumbing rough-in is coordinated through licensed plumbing partners. RDC does not hold an installation license itself and says so. Ask everyone else the same question and compare the answers.

None of this makes RDC the cheapest quote in Scottsdale, and it is not meant to. It is written down so you can hold every bid to the same standard.

Primary bathroom remodel in marble tile with brass fixtures and frameless glass, Scottsdale area

A primary bath in marble tile with brass fixtures, the finish level North Scottsdale homes ask for.

How a Scottsdale Bathroom Remodel Runs, Week by Week

  • Week 1. Demolition, haul-away, and plumbing rough-in. If the drain is moving, the concrete work happens here.
  • Week 2. Blocking and framing, then the bonded waterproofing membrane and its cure. Nothing can be rushed at this step and nothing visible happens, which is the week people find hardest.
  • Weeks 2 to 4. Tile setting, then grout. Format and pattern decide how long this takes more than square footage does.
  • Week 4. Glass is templated only after the tile is finished, then fabricated, which is roughly a week on its own. Vanity, fixtures and trim go in while that is being made.
  • Final. Fixture set, silicone, clean, and a walkthrough against the itemized estimate line by line.

Bathroom Remodeling Across Scottsdale

Scottsdale is not one market and the starting point differs by area.

  • Old Town and south Scottsdale. Mid-century homes and condos where the original bathroom is small and the tub surround has usually failed behind the tile. Tub-to-shower conversions and full rebuilds are the common jobs.
  • McCormick Ranch and Gainey Ranch. 1980s and 1990s homes where the bathroom works but reads dated. Usually a full rebuild with a larger tiled shower in place of a tub-and-shower combo.
  • DC Ranch, Grayhawk and the Airpark. Newer construction where the work is upgrading a builder-grade bathroom rather than repairing one. Design review applies in several of these communities and RDC's itemized proposal lists the material specs a submission needs.
  • North Scottsdale foothills. Larger primary baths, curbless showers, natural stone and slab surfaces, installed to a designer's spec where there is one.

Do You Need HOA Approval in Scottsdale?

For interior bathroom work in a detached Scottsdale home, usually not, because nothing changes outside. It matters in attached homes, townhomes and casitas: if the project also changes flooring outside the bathroom, or touches a shared wall, the association may require written approval first. Impact sound is the usual reason, and the International Building Code baseline of STC 50 and IIC 50 between dwelling units is what most association standards are built on.

RDC asks for your association's standard before quoting, so whatever it requires is on the written estimate rather than surfacing halfway through. Full detail is on the Scottsdale flooring and remodeling page.

Paying for It

A Scottsdale bathroom in the ranges above is a real number, and most people do not pay it out of pocket in one go. RDC offers financing so the project can be paid over time. The estimate is written the same way either way, itemized, with nothing folded into a lump sum.

Where to Start

Start at the Bell Road showroom in Phoenix, roughly 15 to 25 minutes from most of Scottsdale, where you compare full-size tile and slabs side by side in real light rather than from a phone screen. Then RDC measures at your home and writes the itemized estimate. There is no charge for either step and no obligation after them.

Related reading: the tub-to-shower conversion cost guide, the custom walk-in shower page, the Valley-wide bathroom remodel cost guide, and all bathroom remodeling services.

Scottsdale Bathroom Remodeling Questions

A full bathroom remodel in Scottsdale typically runs $12,000 to $28,000 for a secondary or guest bath and $20,000 to $45,000 for a primary bathroom, depending on size, tile selection and whether the shower is curbed or curbless. A tub-to-shower conversion on its own is usually $9,000 to $14,000. RDC quotes every Scottsdale bathroom from an on-site measure and gives a written, itemized estimate rather than a lump sum.

A secondary bathroom is usually 3 to 4 weeks and a primary bathroom 4 to 6 weeks from demolition to final fixtures. The two parts people underestimate are the waterproofing cure before tile can be set, and the glass enclosure, which is measured only after the tile is finished and takes roughly a week to fabricate. If the drain moves, add two to three days for the concrete work.

For interior bathroom work in a detached Scottsdale home, usually not, because nothing changes outside. In an attached home, a townhome or a casita, the association may require approval where flooring changes or where work affects a shared wall. RDC asks for the association's standard before quoting, so anything it requires appears on the written estimate rather than surfacing mid-project.

RDC builds tile showers on a bonded waterproofing membrane, specifically Schluter-Kerdi. Acrylic and solid-surface liner systems are faster and cheaper, and they cover the substrate rather than sealing it. Both look finished on the last day. The difference shows up years later, which is why it is worth asking any Scottsdale contractor which one they are quoting.

Epoxy or professionally sealed grout as standard practice, not as an upgrade line on the estimate. Scottsdale water is hard, so ordinary grout in a shower starts showing mineral deposits within months. This is one of the most common reasons a bathroom looks tired long before it is actually old.

All of Scottsdale, from Old Town and south Scottsdale through McCormick Ranch, Gainey Ranch and the Airpark, up to DC Ranch, Grayhawk and the North Scottsdale foothills. The Bell Road showroom in Phoenix is roughly 15 to 25 minutes from most of Scottsdale, and in-home estimates are free.

RDC is fully insured and every installation carries a 1-year workmanship warranty. RDC does not hold an installation license itself. The installation is performed by the licensed installers RDC works with on every job, and plumbing rough-in is coordinated through licensed plumbing partners. You contract with RDC and deal with RDC throughout. Ask any Scottsdale contractor you are considering for exactly the same detail.

Yes. RDC offers financing so a Scottsdale bathroom can be paid over time rather than all at once, which is how most whole-bathroom projects in this range get done. The estimate is written the same way either way, itemized and with nothing hidden in a lump sum.

Ready to Plan Your Scottsdale Bathroom?

Free written estimate, transparent labor and material breakdown, and a 1-year workmanship warranty on every project.

1-Year Workmanship Warranty on Every Project

Get Your Free Estimate

Tell us about your project and we'll get back to you fast. No obligation, no pressure.